51³Ô¹ÏÃâ·ÑApp

A846-270 Glenegedale Bridge Replacement

Details of the project to replace Glenegedale Bridge.

This project is being led by the Infrastructure Design Team and any enquiries regarding this project can be directed to structures@argyll-bute.gov.uk

We are carrying out a public consultation on the feasibility design of the replacement of Glenegedale Bridge on the A846 from 29th September to 31st October 2023 - find out more and take part in the consultation here

Project Update August 2023

Funding 

Infrastructure Design have secured funding in 2021 of £750,000 which is 80% from the Scottish Government and 20% from 51³Ô¹ÏÃâ·ÑApp and Bute Council to replace this bridge. 

The preferred option has been selected and has been estimated to be £1,400,000 the increase in costs are due to adding the new legislation for active transport, PAS 2020, Covid and Brexit. We are currently seeking additional funding.

Public Consultation

The feasibility report work has now concluded and a public consultation will take place later in 2023.

Preferred Option

The preferred option is to replace the existing defective bridge within the existing road alignment but also increase the width of the structure to allow for active travel use and to improve parapet containment.

Existing Bridge:

Image
Glenegedale Bridge

Preferred option outline plan:

Image
Glenegedale Bridge preferred option outline plan
Did you find what you were looking for?

Why wasn't this information helpful

Limit to 250 characters.